Form Setting

You must be logged in to view this content.

Start Course

Teacher

Difficulty
Easy

Breakout Training

Set up lane/sidewalk closure as required, leaving enough room for the truck/trailer Ensure all cuts have been completed, including double cuts where required With smaller pieces, the double-cut may have to be broken with a sledgehammer and removed by hand Use the breaker to break all materials into a manageable size Remove all concrete/asphalt/gravel, dirt,

Start Course

Teacher

Difficulty
Easy

Finishing training

Review drawings prior to pouring to confirm required finish, broom direction and tool mark locations Unload appropriate tools Spray the inside of the formwork with release oil When mixer shows up, ensure testing is completed if required Use mixer chute or line pump to fill formwork to level slightly above the top of forms Vibrate/bang

Start Course

Teacher

Difficulty