64 Technology Way SE, Calgary
(403) 228-3421

Breakout Training

  1. Set up lane/sidewalk closure as required, leaving enough room for the truck/trailer
  2. Ensure all cuts have been completed, including double cuts where required
  3. With smaller pieces, the double-cut may have to be broken with a sledgehammer and removed by hand
  4. Use the breaker to break all materials into a manageable size
  5. Remove all concrete/asphalt/gravel, dirt, and loam cleanly, paying attention not to mix materials
  6. Cut to appropriate grade maintaining an additional 300mm on all sides to accommodate formwork
  7. Use barricades and construction/caution tape to secure the area when complete
Start Course
Level: Easy
Teacher: North Star